Bathhouse completed

Sakaguchi-san’s work on the bathhouse was completed in the fall of 2018.  The owners, themselves, finished the interior flooring, stone work, dressing room cabinet, and the landscaping.

Entrance and hallway
Hallway
Tatami room
View of tatami room from hallway
Close-up wood stove–stonework done by owners
Tatami room–view of small wood stove
Tatami room–alcove (tokonoma) and sliding closet doors
Dressing room with sink– pocket door goes to toilet room

 

Pre-fab sauna installed by owners
Furoba with tub, shower, and sunoko (removable wooden floor)

 

 

 

 

 

 

Open ceiling
Open ceiling

 

Bathhouse deck
Corner view
Bathhouse in the snow

Leave a Reply

Your email address will not be published. Required fields are marked *